What it is: | A controlled testing environment that simulates extreme weather conditions. Built in 1982. |
| What it tests: | Heat pump systems – up to 72 at a time. | |
| Length of test: | 16 weeks of high stress, accelerated conditions simulating five years of wear and tear. | |
| Why it exists: | SEET supports Trane’s manufacturing philosophy of testing in the lab, not in a consumer’s home. All of Trane’s testing procedures are conducted at much higher extremes and in more stressful conditions than the rest of the industry. |
In the SEET lab, Trane technicians will put a heat pump system through 2,688 hours of continuous testing, watching for signs of weakness or unusual wear. Why do we only test heat pumps? Because if a Climatuff® compressor can withstand SEET as a heat pump, it will easily handle any stress it may encounter as an air conditioner. During the 16-week testing period, heat pump systems undergo two-week cycles of torture, eight consecutive times allowing engineers to measure and manage a system’s quality and performance. Only the strong survive.
Round 1: Heating defrost with snowOutside temp: 23° with snow Round 2: CoolingOutside temp: 100° with fan shut off Round 3: Minimum load heatingOutside temp: 0° After each test period, each unit is disassembled and its compressor is cut apart and analyzed to locate signs of stress. |
Round 4: Power shut offObjective: After 12 hours of power outage, oil has drained or has been washed off bearing surfaces by refrigerant migration. The oil reservoir at the bottom of the sump has been floated above the oil pump opening by the heavier liquid refrigerant. On start-up, Trane’s unique bearing plating will serve as a boundary lubricant until oil flow is established. This test simulates the effects of a power outage, giving engineers the opportunity to see if the compressor can withstand starting conditions with little or no oil pressure. Round 5: Cooling maximum load #2Outside temp: 135° Round 6: Cooling floodOutside temp: 85° Inside temp: 80° with indoor blower off Objective: To subject the compressor to the mechanical stresses of liquid refrigerant flood back. Gross system overcharge or blocked indoor airflow could cause this condition. Round 7: Cooling maximum load #1Outside temp: 125° Inside temp: 80° Objective: To attempt to force the compressor to shut down under the stress of high load conditions. Round 8: Power shut offObjective: To produce a start-up situation that could seize most compressors due to low oil pressure across the bearings. |